What Is a Post-Implementation Review in Project Management?

什么是项目管理中的实施后审查?

2024-08-23 15:30 project manager

本文共2646个字,阅读需27分钟

阅读模式 切换至中文

In short, a post-implementation review is a process to evaluate whether the objectives of the project were met. You can also use it to see how effectively the project was managed. This helps to avoid making similar mistakes with future projects and learn how to run the project better. Post-implementation review is the last step in your project cycle and usually involves an independent party, which can act more objectively in making their determinations about how the project was run. This provides the stakeholders of the project the confidence to know that the objectives of the project were met successfully. How do you lead a post-mortem on your project to learn how to repeat the good stuff and lose the bad stuff? Read on. What Is a Post-Implementation Review? What are you going to do when the project’s over? Have a little celebration and move on to the next one, right? That’s not best practice. The project might be over, but the post-implementation or post-project review process continues. That means that if you delivered a product or a service, the project might be completed, but you still need to check on the viability of the product or service. You might have achieved the goals you set out for the project, but what about the business needs that product or service was responding to? Think of it as an ongoing step in your project closure process. It’s a post-project review or post-implementation review, which is part of your project management responsibilities. It’s also a great way to identify project successes, deliverables and achievements and learn lessons from those parts of the project that didn’t work out as planned. How do you practically apply a post-implementation review? How can you be sure that the project solved the problems it was created to address? Are there more benefits that can be unpacked from the project? What are the lessons learned? To answer those and more questions, you need to follow a process, which is much easier with project management software. ProjectManager is award-winning project management software that has the tools to plan and track project data through every phase. Plan project details carefully on the Gantt chart and use dashboard and reporting features to catch bottlenecks. In a few clicks, download the reports and share them with stakeholders to let them know whether the project’s goals were met. Get started with ProjectManager today for free. Post-Implementation Review Process: 11-Step Checklist To get the most out of your project, you want to employ a post-implementation review process. While this can start at any time after the project plan has been executed, starting it sooner than later makes sure that the project details are still fresh in the team’s mind. While to get the most from the process, you’ll want to wait a while, after the project’s product or service has had time to exist in the real world. But at least start the process by beginning to list ideas and observations. You don’t want to wait until the participants are distracted by other projects. Each project team can develop its post-implementation review process to make it as detailed as needed, but here are some general post-implementation review steps that can be applied to any project. These can be used to make a unique post-implementation review checklist. 1. Review Project Goals & Objectives Look over the goals and objectives of the project to determine if the deliverables functioned as planned. Calculate the error rate of the project. Review the deliverables to see if they adjusted to changes in the market. Figure out how well-trained and supported end-users are. List the controls and systems that are in place and if they are working. Make sure that problems are being addressed. Find out if the planned goal aligned with the results. 2. Determine Whether Project Success Criteria Were Met Before the project began, a set of project criteria was established. This is used during the execution phase to ensure that there is a way to measure the project. Not that the project has been implemented, review those project success criteria to see if they were met. 3. Assess the Project Constraints Next, review the project constraints. A project constraint is any limitation that can affect a project’s ability to be completed successfully. There are project constraints to look over. Time: Determines whether the project can be completed within the planned timeframe. Scope: Whether the project can be completed as originally detailed, including client requirements and the features and tasks needed to meet those expectations. Cost: Looks at if the project is completed within the budget. Quality: Maintains the quality standards as expected by the client. Resources: Limitations on the availability of resources that are necessary to complete a task or achieve an objective. Risk: Risks can be positive, as in opportunities, or negative, as in threats, which can occur anytime throughout the project’s life cycle. 4. Get Feedback From Internal & External Project Stakeholders Stakeholder feedback can help identify strengths and weaknesses and guide improvements for future projects. Therefore, the project manager should identify all internal and external stakeholders and determine their level of interest and influence as well as regularly meet with them throughout the life cycle of the project. 5. Conduct a Gap Analysis Gap analysis is the method of assessing how a plan differed from the actual application, and is always a powerful tool to see what benchmarks you met, and which you didn’t. You can start with your project charter and see how closely you adhered to your objectives. Look at your deliverables. Are they at the quality level you expected? When there are gaps discovered, figure out how they can be closed. 6. Determine the Cost-Benefit Ratio of the Project A cost-benefit ratio is an indicator showing the relationship between the relative costs and benefits of a proposed project, expressed in monetary or qualitative terms. If a project has a cost-benefit ratio of greater than 1,0, the project is expected to deliver a positive net present value. This cost-benefit analysis can determine if the project’s benefits outweigh its costs. The questions below can help gather conclusions from a cost-benefit analysis after the project has been completed. Cost: How much did the project end up costing? What are the costs involved in operating the project’s result? Are the costs aligned to the benefits of the project? If this isn’t the case, how can you improve the cost next time? Benefits: Did the project achieve the benefits projected, and if not, why, and how can that be improved? What opportunities are there to further the results? Are there other changes you could apply to help maximize the project’s results? 7. Review the Change Management Log The change management log serves as a formal record of requests for change, including details, impact assessment, decision-making, implementation status and closure. This not only provides transparency, accountability and effective management of changes, but when reviewed post-implementation can help review if change was managed successfully or not. 8. Compare Estimated vs. Actual Costs When making a project budget, all project costs are estimated. As the project is executed, those costs should be tracked. Comparing the estimated costs to the actual costs helps keep the project from going over budget when executing the work and, afterward, shows if and when the project went over budget. It can also hint as to why this happened. 9. Evaluate the Individual Performance of Team Members While it depends on the project, in general terms all project managers want to compare hours worked against their deliverables to determine who was productive. By measuring each team member’s performance, project managers can see who delivered as expected and who didn’t. This data can help refine the management of future projects to help teams perform better. 10. Make a Lessons Learned Document A lessons-learned document is a great tool to capture what worked and what didn’t work in a project so that information can be applied to future projects. This allows managers to take advantage of what is positive about a project and resolve the negative aspects. This process should include all team members, stakeholders and even vendors and suppliers. 11. Make a Post Implementation Review Report Make a post-implementation review report to document what you learned from the review, whether there are actions needed to get the beneficial results you want and list the lessons you’ve learned, noting how the project can impact future projects, so you can build on success and avoid problems. How to Conduct a Post-Implementation Review After the project’s deliverables have gone through at least one successful business cycle, you can get started on the review. There are project closure checklists that help frame the process. Here are some of the best practices for conducting the review: Trust. To get the information you need, you want honesty from your participants. Therefore, tell them you want openness, without fear of retribution. The more critical and truthful their observations about the project are, the more successful the review. Objectivity. While you want honesty, you don’t want sour grapes or interpersonal issues clouding observations with bad feelings or to settle old scores. Seek objectivity, or as close to an impartial critique as can be expected. Documentation. Like all project management, you want to create a paper trail that illustrates how you went from Point A to Point B. By documenting the practices and procedures that created the successes in the project, you’ll be able to follow them again in future projects. Hindsight. As you develop a narrative as to what worked and what didn’t, what surprises arose during the project and how you dealt with them, understand that this hindsight vision can also help as you look forward towards new projects. Improvement. The point of this review process is not to blame individuals or teams for mistakes but to learn from experience and then apply that knowledge to future projects. Stay focused on what’s next, rather than looking back as a means of applying guilt. Project Review Template Use this free project review template for Word to kick-start your post-implementation review process. It has all the essentials to evaluate the success of your project, so you can make improvements for next time. Benefits of Post-Implementation Review in Project Management There are many potential benefits to making a post-implementation review after a project is finished. Here are some of them. Allows organizations to gather information that will help plan future projects Findings from post-implementation reviews are factored in during the project intake process when project management offices (PMOs) prioritize projects Helps to zoom into key project management areas such as resource management, cost tracking or risk management beyond project reports Conducting regular post-implementation reviews greatly improves the project management maturity of an organization Post-project reviews help organizations assess the effectiveness of team leaders such as project, program, or project portfolio managers. More Free Post-Implementation Review Templates To help with the post-implement review process, download the following free templates. There are over 100 free project management templates for Excel and Word on our site. They can help manage every phase of a project across multiple industries. Here are a few links to free post-implementation review templates. Post-Mortem Template A post-mortem is used to examine a completed project and provide a structured post-implementation review and analysis. Use this free post-mortem template for Word when getting feedback from teams and stakeholders. Lessons Learned Template The lessons learned template for Excel helps project managers and their teams learn from a post-implementation review to avoid repeating mistakes and improve on winning processes. It helps everyone describe what happened, its impact and more. ProjectManager Helps Post-Implementation Review One of the ways to conduct a post-implementation review is by going over the project paperwork. These documents provide hard data on how a project proceeded as planned or went off-track. If you’ve run your project with ProjectManager, you already have a wealth of information on hand that you can use to look back at the closed project and determine where it went right and wrong. To make recommendations on how to manage projects better in the future, you need a clear picture of how they were managed in the past. Timesheets for Workload Review With ProjectManager, timesheets are online and easily submitted by team members and approved by project managers. This provides a window into the allocation of your personnel and if those resources were over-tasked or underused. Maybe they could have been scheduled better or the assignments could have been more balanced. ProjectManager.com’s timesheet feature collects that data and gives you the information you need to suggest improvements. Report on Tasks and Their Successes Speaking of tasks, you’ll want to take a deep dive into how tasks were executed. ProjectManager has project management reports that reflect the status of your projects. They show when a task was started, how long it took to complete if there were dependencies, bottlenecks or delays that left teams unnecessarily idle. Because ProjectManager tasks also collect comments and supporting documents, they are a great resource for looking into the execution of individual tasks and see if there are ways to make the process more efficient. These reports will also help project managers pinpoint the team members who they’ll want to interview during the post-implementation review. Final Thoughts on Post-Implementation Review There are many ways to close a project, but too often the post-implementation review is neglected. It’s understandable, as a critical review can open some old wounds. When you’re dealing with a lot of people and asking them for criticism of the project, there’s the potential to step on someone’s toes and create hurt feelings that can creates some unpleasant political issues within your team or organization. Therefore, be clear that what you’re interested in is not a personal attack, but a systemic overview of process and how everyone together can work towards improving it. That’s why it often helps to hire an independent party to collect the post-project data. Don’t forget to review all the project documentation. It’ll help you better assess what worked and what didn’t, and provide you with an overview of the project and where there might have been unforeseen holes that you can then fill in with upcoming projects. When you’re done with the review be completely transparent. Share your findings in a report and make sure everyone has access to these documents. If you want to, it can help if you present the information to the organization. Your goal is to create better projects, and that information isn’t proprietary. Everyone needs to know. Related Project Closure Content Closing your projects and evaluating their success is one of the most important stages in the project life cycle. We’ve created dozens of blogs, templates and guides to help you master this process. Lessons Learned Template Project Closure Template Project Review Template 5 Steps to Project Closure (Checklist Included) Project Evaluation Process: Definition, Methods & Steps 10 Steps for Successful Project Completion (Templates Included) When you’re conducting a post-implementation review, you’re working with a lot of data. That’s why ProjectManager is so useful. Our cloud-based software gathers real-time data on your project and collects it in an easy-to-share manner that can be reported on clearly. Not only does it help plan and monitor your project, but report on it too. See how by taking a free 30-day trial.
简而言之,实施后审查是一个评估项目目标是否实现的过程。您还可以使用它来查看项目管理的有效性。这有助于避免在未来的项目中犯类似的错误,并了解如何更好地运行项目。 实施后审查是项目周期的最后一步,通常涉及独立的一方,他们可以更客观地确定项目的运行方式。这为项目的利益相关者提供了信心,使他们知道项目的目标已经成功实现。 你如何对你的项目进行事后分析,学习如何重复好的东西,去掉坏的东西?请继续阅读。 什么是实施后审查? 项目结束后你打算怎么办?好好庆祝一下然后继续下一个,好吗?这不是最佳实践。项目可能已经结束,但实施后或项目后审查过程仍在继续。 这意味着,如果你交付了一个产品或服务,项目可能已经完成,但你仍然需要检查产品或服务的可行性。您可能已经实现了为项目设定的目标,但是产品或服务所响应的业务需求呢? 将其视为项目关闭过程中的一个持续步骤。这是项目后审查或实施后审查,这是项目管理职责的一部分。这也是一个很好的方式来确定项目的成功,可交付成果和成就,并从项目中没有按计划进行的部分中吸取教训。 您如何实际应用实施后审查?你怎么能确定这个项目解决了它要解决的问题?是否有更多的好处可以从项目中释放出来?有哪些经验教训?要回答这些和更多的问题,你需要遵循一个过程,这是更容易与项目管理软件。ProjectManager是屡获殊荣的项目管理软件,具有在每个阶段规划和跟踪项目数据的工具。在流程图上仔细规划项目细节,并使用仪表板和报告功能来捕捉瓶颈。只需点击几下,即可下载报告并与利益相关者共享,让他们了解项目目标是否实现。立即免费开始使用ProjectManager。 实施后审查流程:11步检查表 为了最大限度地利用您的项目,您希望采用一个实现后审查过程。虽然这可以在项目计划执行后的任何时候开始,但尽早开始可以确保项目细节在团队的脑海中仍然是新鲜的。 虽然要从过程中获得最大的收益,但您需要等待一段时间,在项目的产品或服务有时间在现实世界中存在之后。但至少在开始这个过程时,先列出想法和观察结果。你不想等到参与者被其他项目分散注意力。 每个项目团队都可以根据需要制定其实施后审查流程,但这里有一些通用的实施后审查步骤,可以应用于任何项目。这些可用于制作独特的实施后审查清单。 1.审查项目目标 检查项目的目标和目的,以确定可交付成果是否按计划运行。计算项目的错误率。审查交付成果,看看它们是否适应了市场的变化。了解最终用户的培训和支持程度。列出已到位的控制措施和系统,以及它们是否有效。确保问题得到解决。看看计划的目标是否与结果一致。 2.确定是否满足项目成功标准 在项目开始之前,制定了一套项目标准。这在执行阶段使用,以确保有一种方法来衡量项目。不是说项目已经实施,而是检查项目成功的标准,看看它们是否得到了满足。 3.评估项目限制 接下来,检查项目约束。项目约束是任何可能影响项目成功完成的能力的限制。有一些项目限制需要考虑。 时间:确定项目是否可以在计划时间内完成。 适用范围:项目是否能够按照最初的详细说明完成,包括客户要求以及满足这些期望所需的功能和任务。 成本:看项目是否在预算内完成。 质量:保持客户期望的质量标准。 资源:对完成任务或实现目标所需的资源可用性的限制。 风险:风险可以是积极的,如机会,也可以是消极的,如威胁,这可能在项目生命周期的任何时候发生。 4.从内部和外部项目利益相关者获得反馈 利益相关者的反馈可以帮助确定优势和劣势,并指导未来项目的改进。因此,项目经理应确定所有内部和外部利益攸关方,确定他们的兴趣和影响程度,并在项目的整个生命周期内定期与他们会面。 5.进行差距分析 差距分析是评估计划与实际应用程序之间差异的方法,并且始终是一个强大的工具,可以查看您满足了哪些基准,哪些没有。你可以从项目章程开始,看看你有多接近你的目标。看看你的可交付成果。他们是否达到了你所期望的质量水平?当发现差距时,找出如何弥补差距。 6.确定项目的成本效益比 成本效益比是一个指标,表明拟议项目的相对成本和效益之间的关系,以货币或质量表示。如果一个项目的成本效益比大于1.0,则该项目预计将提供正的净现值。这种成本效益分析可以确定项目的收益是否超过其成本。 以下问题有助于在项目完成后从成本效益分析中得出结论。 成本:项目最终花费了多少钱?项目成果的运营成本是多少?成本是否与项目的收益相一致?如果不是这样的话,下次怎么提高成本呢? 效益:项目是否实现了预期的效益?如果没有,为什么?如何改进?有哪些机会可以进一步取得成果?是否有其他的变化,你可以应用,以帮助最大限度地提高项目的成果? 7.查看变更管理日志 变更管理日志是变更请求的正式记录,包括详细信息、影响评估、决策、实施状态和关闭。这不仅提供了透明度、问责制和对变革的有效管理,而且在对实施后情况进行审查时,有助于审查变革管理是否成功。 8.比较估计成本与实际成本 在制定项目预算时,所有项目成本都是估计的。随着项目的执行,这些费用应加以跟踪。将估计成本与实际成本进行比较有助于防止项目在执行工作时超出预算,然后显示项目是否以及何时超出预算。它也可以暗示为什么会发生这种情况。 9.评估团队成员的个人表现 虽然这取决于项目,但总的来说,所有项目经理都希望将工作时间与可交付成果进行比较,以确定谁是生产力。通过衡量每个团队成员的表现,项目经理可以看到谁按预期交付,谁没有。这些数据可以帮助改进未来项目的管理,以帮助团队更好地执行。 10.制作经验教训文档 经验教训文档是一个很好的工具,可以用来捕捉项目中哪些工作有效,哪些不有效,以便将信息应用于未来的项目。这使管理者能够利用项目的积极方面,解决消极方面。这个过程应该包括所有的团队成员、利益相关者甚至供应商和供应商。 11.制作实施后审查报告 做一个实施后的回顾报告,记录你从回顾中学到了什么,是否需要采取行动来获得你想要的有益结果,并列出你学到的教训,注意项目如何影响未来的项目,这样你就可以在成功的基础上避免问题。 如何进行实施后审查 在项目的可交付成果至少经历了一个成功的业务周期之后,您就可以开始评审了。有一些项目结束清单可以帮助制定流程。以下是进行审查的一些最佳做法: 信任为了得到你需要的信息,你希望你的参与者诚实。“你说,你要的是一种敬畏,一种敬畏,一种敬畏。他们对项目的观察越有批判性和真实性,评审就越成功。 客观。虽然你想要诚实,但你不希望酸葡萄或人际关系问题用坏的感觉或解决旧的分数来掩盖观察。寻求客观性,或尽可能接近公正的批评。 文献.与所有项目管理一样,您希望创建一个文件记录来说明您如何从A点到B点。通过记录在项目中取得成功的实践和过程,您将能够在未来的项目中再次遵循它们。 马后炮当你开始叙述什么是有效的,什么是无效的,在项目中出现了什么意外,以及你是如何处理它们的时候,要明白,这种事后诸葛亮的观点也可以帮助你展望新的项目。 改进.这个审查过程的重点不是责备个人或团队的错误,而是从经验中学习,然后将这些知识应用到未来的项目中。把注意力集中在下一步,而不是回顾过去,作为一种内疚的手段。 项目评审模板 使用这个免费的Word项目审查模板来启动您的实施后审查流程。它具有评估项目成功的所有要素,因此您可以在下次进行改进。 项目管理中实施后审查的好处 在项目完成后进行实施后审查有许多潜在的好处。以下是其中的一些。 允许组织收集有助于规划未来项目的信息 项目管理办公室在确定项目优先次序时,在项目接收过程中考虑了实施后审查的结果 有助于深入了解关键的项目管理领域,如资源管理、成本跟踪或项目报告以外的风险管理 进行定期的实施后审查可以大大提高组织的项目管理成熟度 项目后审查帮助组织评估项目、项目群或项目组合经理等团队领导者的有效性。 更多免费的实施后审查模板 为了帮助实施后审查过程,请下载以下免费模板。我们的网站上有超过100个免费的Excel和Word项目管理模板。他们可以帮助管理跨多个行业的项目的每个阶段。这里有一些免费的实施后审查模板的链接。 尸检模板 事后检查用于检查已完成的项目,并提供结构化的实施后审查和分析。在从团队和利益相关者那里获得反馈时,使用这个免费的Word事后分析模板。 经验教训模板 Excel的经验教训模板可帮助项目经理及其团队从实施后审查中学习,以避免重复错误并改进成功流程。它可以帮助每个人描述所发生的事情、其影响等。 ProjectManager帮助进行实施后审查 进行实施后审查的方法之一是检查项目文书工作。这些文件提供了项目如何按计划进行或偏离轨道的硬数据。 如果您已经使用ProjectManager运行了项目,那么您手头上已经有了大量的信息,您可以使用这些信息来回顾已关闭的项目并确定它的正确和错误之处。为了对未来如何更好地管理项目提出建议,您需要清楚地了解过去是如何管理项目的。 审查时间表 使用ProjectManager,时间表可以在线,并且可以由团队成员轻松提交,并由项目经理批准。这提供了一个窗口,让您了解人员的分配情况,以及这些资源是否被过度分配或未得到充分利用。也许他们本可以安排得更好,或者任务本可以更平衡。ProjectManager.com的timesthesion功能收集这些数据,并为您提供建议改进所需的信息。 关于各项任务及其成果的报告 说到任务,您可能想深入了解任务的执行方式。ProjectManager具有反映项目状态的项目管理报告。它们显示了任务何时开始,如果存在依赖关系,瓶颈或延迟,使团队不必要地闲置,需要多长时间才能完成。 由于ProjectManager任务还收集注释和支持文档,因此它们是查看单个任务执行情况并查看是否有方法使流程更高效的重要资源。这些报告还将帮助项目经理确定他们在实施后审查期间想要采访的团队成员。 关于实施后审查的最后思考 结束一个项目的方法有很多,但往往忽视了实施后的审查。这是可以理解的,因为批评性的评论可能会揭开一些旧伤口。 当你和很多人打交道,并要求他们对项目提出批评时,有可能踩到别人的脚趾,造成伤害,这可能会在你的团队或组织中产生一些不愉快的政治问题。因此,要清楚,你感兴趣的不是人身攻击,而是对过程的系统性概述,以及每个人如何共同努力改善它。这就是为什么它通常有助于聘请一个独立的方来收集项目后的数据。 不要忘记查看所有项目文档。它将帮助您更好地评估哪些工作和哪些没有工作,并为您提供项目的概述以及可能存在不可预见的漏洞的地方,然后您可以用即将到来的项目来填补这些漏洞。 当你完成审查时,要完全透明。在报告中分享您的发现,并确保每个人都可以访问这些文档。如果你愿意,如果你向组织提供信息,它会有所帮助。您的目标是创建更好的项目,而这些信息不是专有的。所有人都得知道。 项目收尾相关内容 结束项目并评估其成功与否是项目生命周期中最重要的阶段之一。我们已经创建了几十个博客,模板和指南,以帮助您掌握这一过程。 经验教训模板 项目结束模板 项目评审模板 项目结束的5个步骤(包括检查表) 项目评估过程:定义、方法和步骤 成功完成项目的10个步骤(包括模板) 当您进行实施后审查时,您正在处理大量数据。这就是为什么ProjectManager如此有用。我们基于云的软件可以收集您项目的实时数据,并以易于共享的方式收集数据,以便清楚地报告。它不仅可以帮助计划和监控您的项目,还可以报告项目。通过30天免费试用了解如何操作。

以上中文文本为机器翻译,存在不同程度偏差和错误,请理解并参考英文原文阅读。

阅读原文